• Led production shift operations at Ather’s EV plant, directly managing a team of ~300 associates.
• Achieved 12% increase in daily production throughput through Kaizen-based line optimization.
• Implemented real-time quality checkpoints, reducing defect rate by 18%.
• Coordinated with Design, QA, and Inventory teams to eliminate bottlenecks and minimize downtime.
• Applied lean manufacturing principles including TPM, 5S, and conducted regular safety audits & MBOM audits.
• Experienced with MES tools and production planning software.
• Achieved 1000+ production target in a single day with 95% efficiency.
• Ensured & completed the OJT’s of 500+ candidates.